FACS

Ason Group was commissioned to prepare a Transport Management & Accessibility Plan (TMAP) in support of a Planning Proposal at 26 Kissing Point Road and 266 Victoria Road, Parramatta.

The Planning Proposal provides for:

  • 2,700 new dwellings.
  • 5,000m2 of retail and commercial floor space.
  • Community facilities, including open space, accessible bushland reserve.

Our work included

  • The development of an Aimsun model in line with RMS Traffic Modelling Guidelines, including Base Model development, calibration and validation. Subsequent Option Testing included various access and land use scenarios, including the provision of a new secondary school.
  • Demand analysis of the precinct including possible light rail options.
  • Data collection including traffic, travel time and Origin-Destination surveys.
  • Detailed assessment of available internal and external access options, in a network constrained by existing grade-separated junctions.
  • Consultation with the Transport for NSW throughout the assessment, including the Parramatta Light Rail team.

Similar Projects

The Master Plan Ason Group was engaged by Frasers to assist in its bid and subsequent masterplan development of the Ivanhoe Estate, Macquarie Park. The development is Australia’s largest integrated housing project. The Project included 3,300 new dwellings including 1,078 social and affordable units. Provision for a new school, child

View Details

Ivanhoe Estate Masterplan

Ason Group has been engaged to undertake traffic modelling works to support the proposed upgrade of the Swan Hill/ Murray River Road bridge. The bridge provides a key crossing opportunity across the Murray River and services agricultural freight routes between NSW and Victoria. It also operates as a lift span

View Details

Swan Hill Bridge Upgrade Traffic Study

The Mamre Road Precinct (MRP) forms part of the Western Sydney Employment Area (WSEA) and Aerotropolis was rezoned in June 2020 to permit industrial land uses across approximately 850 hectares of land and over 3.5 million square metres. Ason Group was engaged to work with key stakeholders including Transport for

View Details

Mamre Road Precinct – Road Network Assessment