FACS

Ason Group was commissioned to prepare a Transport Management & Accessibility Plan (TMAP) in support of a Planning Proposal at 26 Kissing Point Road and 266 Victoria Road, Parramatta.

The Planning Proposal provides for:

  • 2,700 new dwellings.
  • 5,000m2 of retail and commercial floor space.
  • Community facilities, including open space, accessible bushland reserve.

Our work included

  • The development of an Aimsun model in line with RMS Traffic Modelling Guidelines, including Base Model development, calibration and validation. Subsequent Option Testing included various access and land use scenarios, including the provision of a new secondary school.
  • Demand analysis of the precinct including possible light rail options.
  • Data collection including traffic, travel time and Origin-Destination surveys.
  • Detailed assessment of available internal and external access options, in a network constrained by existing grade-separated junctions.
  • Consultation with the Transport for NSW throughout the assessment, including the Parramatta Light Rail team.

Similar Projects

Ason Group was engaged to undertake the capacity analysis and assess the operational performance of the current and proposed design in terms of Level of Service provided to pedestrian circulation on the block and adjacent streets in Sydney CBD. The Legion pedestrian model was developed to perform virtual experiments on

View Details

Pitt Street Modelling

Ason Group has been involved in the development assessment of numerous Goodman assets throughout the Western Sydney Employment Area (WSEA), including Oakdale Central, Oakdale South, Oakdale East and Oakdale West Industrial Estates. In support of the Construction Environmental Management Plan (CEMP) for Oakdale West, Ason Group was tasked to prepare

View Details

Oakdale West Precinct

Ason Group was engaged by TfNSW to investigate the Southern Link Road (SLR) design and upgrade options to carry out the concept design, environmental assessment, detailed design and staging for SLR. The concept design has been divided into three stages. Stage 1 connects Mamre Road to Compass Drive Stage 2

View Details

Southern Link Road Corridor Concept Design