Southern Link Road Corridor Concept Design

Ason Group was engaged by TfNSW to investigate the Southern Link Road (SLR) design and upgrade options to carry out the concept design, environmental assessment, detailed design and staging for SLR. The concept design has been divided into three stages. 

Stage 1 connects Mamre Road to Compass Drive
Stage 2 connects Compass Drive to Old Wallgrove Road
Stage 3 connects Old Wallgrove Road to Wallgrove

Southern Link Road is a proposed new east-west corridor that would provide an additional link between Mamre Road, Kemps Creek and Wallgrove Road, Horsley Park. 

Southern Link Road is expected to be around 7.5 kilometres long and provides access to the future industrial development that would create employment and economic growth in the surrounding Western Sydney area. 

Our work included

  • A review of historical traffic survey data is used to develop base model and validate with the latest SCATS data.  
  • Develop, calibrate and validate the mesoscopic- microscopic Hybrid’ model in Aimsun of the SLR and surrounding WSEA.
  • Develop a base model to assess existing traffic patterns within the study area and identify congestion locations in the study precinct.  
  • Conduct multi-criteria assessment for the options and construction staging analysis.
  • Develop future year scenarios 2031 and 2036 to access SLR options against the ‘do nothing’ road network configuration.  
  • Develop travel demand management (TDM) strategy to reduce travel demand and redistribute the traffic in horizon years.
  • The model provide the inputs and measures required for the Business cases economics, pavement design and environmental assessments.  
  • The model output informs the SLR development staging and defines road infrastructure upgrades required to mitigate traffic growth.  

Similar Projects

Ason Group was engaged by TfNSW to undertake multiple ITAP assessments including over 30 intersections and corridors across a range of locations in NSW. Ason Group proposed and successfully implemented the use of drone technology to record intersection operations and deliver a greater level of traffic movement insights not previously

View Details

Integrated Transport Action Plan (ITAP)

The Enfield ILC development has been the subject of a Major Project assessment and approvals under the previous Part 3A. Ason Group’s ongoing responsibility on this project includes the traffic and transport modelling of both on and off-site vehicle movements and necessary analysis and detailed design works for each warehouse

View Details

Enfield Intermodal Logistic Centre

The Master Plan Ason Group was engaged by Frasers to assist in its bid and subsequent masterplan development of the Ivanhoe Estate, Macquarie Park. The development is Australia’s largest integrated housing project. The Project included 3,300 new dwellings including 1,078 social and affordable units. Provision for a new school, child

View Details

Ivanhoe Estate Masterplan