Integrated Transport Action Plan (ITAP)

Ason Group was engaged by TfNSW to undertake multiple ITAP assessments including over 30 intersections and corridors across a range of locations in NSW. Ason Group proposed and successfully implemented the use of drone technology to record intersection operations and deliver a greater level of traffic movement insights not previously achieved in the ITAP process. This data was supplemented with SCATS, Compass IoT and TomTom data to provide robust calibration of intersection operation.

The results of the project were reported in dynamic dashboards using Tableau and issued to TfNSW in digital format as opposed to the traditional document output, enabling continued use by the agency in the optimisation of the road network.

The successful implementation has led to ongoing engagements with TfNSW to deliver this level of analytics across further locations within both NSW and QLD.

Integrated Transport Action Plans (ITAP) provide the evidence base and traffic modelling required by TfNSW and other stakeholders to review and assess key areas of congestion and the efficacy of road network improvements.

Our work included

  • Coordination of traffic surveys and drone surveys.
  • Data cleansing and transformation of various data sets to enable comparison between pre-COVID and current traffic volumes and performance.
  • Video and data analytics to identify and track individual vehicle movements, pedestrian behaviour, and trace desire lines.
  • Travel time analysis using GPS data to generate heat maps and identify road network pain points and areas of focus.
  • Intersection modelling and network modelling.
  • Data visualisation using Tableau to create dashboards for stakeholder communication.

Similar Projects

Ason Group was originally commissioned in 2017 to undertake the development assessment of the Master Plan for 45-61 Waterloo Road Macquarie Park, providing for some 117,000m2 of commercial GFA.Subsequently we have also been commissioned to provide Transport Assessments for the first 3 buildings, including Building C (now known as “The

View Details

Waterloo Road

The NSW National Parks & Wildlife Service (NPWS) manages 889 national parks and reserves with varying levels of visitation. The number of visits to NSW national parks is growing, with 51.6 million visits in 2016, 60 million in 2018 and 63 million expected in 2023. In recognition of this increasing

View Details

NSW National Parks and Wildlife Service (NPWS)

The Master Plan Ason Group was engaged by Frasers to assist in its bid and subsequent masterplan development of the Ivanhoe Estate, Macquarie Park. The development is Australia’s largest integrated housing project. The Project included 3,300 new dwellings including 1,078 social and affordable units. Provision for a new school, child

View Details

Ivanhoe Estate Masterplan